You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The most typical use case is to create a work report either at the end of the week (Friday) or early in the next week (Monday). Both of these should automatically choose the work week which was just completed. But using --current-week on Monday just results in a report covering less than 24 hours, which is not useful. There should be something like --last-completed-week which has DWIM behaviour.
The text was updated successfully, but these errors were encountered:
The most typical use case is to create a work report either at the end of the week (Friday) or early in the next week (Monday). Both of these should automatically choose the work week which was just completed. But using
--current-week
on Monday just results in a report covering less than 24 hours, which is not useful. There should be something like--last-completed-week
which has DWIM behaviour.The text was updated successfully, but these errors were encountered: