I am estimating a model with fixed effects and clustered standard errors using the lfe-package.
As it turns out, I have a huge t-value (23.317) but only a comparatively small p-value (0.0273). This seems to have something to do with me using the projecting out of fixed effects. When I estimate the fixed effects manually as control variables, my p-value is too small to be reported <2e-16 .
Consider the following working example (I am sorry if it's more complicated than strictly necessary, I am trying to be close to my application):
I am simply estimating a pooled panel estimator of 10 time series over 50 periods. And I assume that there are two clusters in the time series.
So it must be related to the projecting out of fixed effects, but this difference is so huge, that I would like to know a bit more about it. Does someone know what the underlying issue is here?
The text was updated successfully, but these errors were encountered:
I was using the most recent version 2.8.5 of lfe for the results above. I just learned that this discrepancy between the p-values does not occur for version 2.8.3 . And the issue seems to be tightly linked to the two-way clustering.
Hey @Sarastro1804, I'm not sure of the answer, but it definitely seems like a degrees of freedom question. One way you might think about it is to estimate the p-value by simulation: set up the data so the expected value of the x:indicator coefficient is zero, run the regression, record the resulting coefficient, and repeat 10000 times. (Set nostats=TRUE in the felm call to speed things up a little.) Then find where your actual x:indicator coefficient falls in the distribution of 10000.
(Note: I asked this on stack overflow before, but did not get any answer to it, https://stackoverflow.com/questions/61250494/question-about-p-values-with-clustered-standard-errors-in-lfe-package-in-r)
I am estimating a model with fixed effects and clustered standard errors using the lfe-package.
As it turns out, I have a huge t-value (23.317) but only a comparatively small p-value (0.0273). This seems to have something to do with me using the projecting out of fixed effects. When I estimate the fixed effects manually as control variables, my p-value is too small to be reported <2e-16 .
Consider the following working example (I am sorry if it's more complicated than strictly necessary, I am trying to be close to my application):
I am simply estimating a pooled panel estimator of 10 time series over 50 periods. And I assume that there are two clusters in the time series.
The first results gives me
indicator:x 3.8625 0.1657 23.317 0.0273 *
The second results2 gives me
indicator:x 3.86252 0.20133 19.185 < 2e-16 ***
So it must be related to the projecting out of fixed effects, but this difference is so huge, that I would like to know a bit more about it. Does someone know what the underlying issue is here?