Skip to content

build: Downstream Vulkan-Tools 1.3.268 #30

build: Downstream Vulkan-Tools 1.3.268

build: Downstream Vulkan-Tools 1.3.268 #30

Triggered via push October 25, 2023 13:12
Status Failure
Total duration 7h 12m 18s
Artifacts

tools_sc.yml

on: push
Matrix: linux-sc
Matrix: windows-sc
Fit to window
Zoom out
Zoom in

Annotations

14 errors
tools_codegen
Process completed with exit code 1.
linux-sc (clang, clang++, Debug, ubuntu-22.04)
Process completed with exit code 1.
linux-sc (gcc, g++, Release, ubuntu-22.04)
The job was canceled because "clang_clang___Debug_ubunt" failed.
linux-sc (clang, clang++, Release, ubuntu-22.04)
The job was canceled because "clang_clang___Debug_ubunt" failed.
linux-sc (clang, clang++, Release, ubuntu-22.04)
The operation was canceled.
linux-sc (gcc, g++, Debug, ubuntu-22.04)
The job was canceled because "clang_clang___Debug_ubunt" failed.
linux-sc (gcc, g++, Debug, ubuntu-22.04)
The operation was canceled.
windows-sc (Win32, Debug, windows-latest)
Process completed with exit code 1.
windows-sc (x64, Debug, windows-latest)
The job was canceled because "Win32_Debug_windows-lates" failed.
windows-sc (x64, Debug, windows-latest)
The operation was canceled.
windows-sc (Win32, Release, windows-latest)
The job was canceled because "Win32_Debug_windows-lates" failed.
windows-sc (Win32, Release, windows-latest)
The operation was canceled.
windows-sc (x64, Release, windows-latest)
The job was canceled because "Win32_Debug_windows-lates" failed.
windows-sc (x64, Release, windows-latest)
The operation was canceled.