Feature/abzu 101180 proget #90
Merged
Azure Pipelines / UKHO.Erp-Facade
succeeded
Nov 14, 2023 in 1h 2m 4s
Build #UKHO.Erp-Facade_Abzu-101180-proget_23318.1 succeeded
Details
- Failed: 0 (0.00%, 0 new, 0 recurring)
- Passed: 110 (100.00%)
- Other: 0 (0.00%)
- Total: 110
- 10438 of 10439 blocks covered (99.99%)
- 2051 of 2052 lines covered (99.95%)
Loading