Skip to content

type fixes and other numerous fixes #14

type fixes and other numerous fixes

type fixes and other numerous fixes #14

Triggered via pull request February 23, 2024 07:36
Status Cancelled
Total duration 1m 20s
Artifacts

integration-test.yml

on: pull_request
Matrix: transcription
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Integration test on master [email protected]
Canceling since a higher priority waiting request for 'integration-test-chore/type-fix' exists
Integration test on master [email protected]
Process completed with exit code 1.
Integration test on master [email protected]
The operation was canceled.
Integration test on stable28 [email protected]
Canceling since a higher priority waiting request for 'integration-test-chore/type-fix' exists
Integration test on stable28 [email protected]
The operation was canceled.
Integration test on stable28 [email protected]
Process completed with exit code 1.