Skip to content

Commit

Permalink
schema/codelists: Remove withdrawn codes from finalStatus codelists
Browse files Browse the repository at this point in the history
  • Loading branch information
duncandewhurst committed Oct 24, 2023
1 parent 4e28513 commit 1438e30
Show file tree
Hide file tree
Showing 3 changed files with 0 additions and 3 deletions.
1 change: 0 additions & 1 deletion schema/codelists/awardFinalStatus.csv
Original file line number Diff line number Diff line change
Expand Up @@ -2,4 +2,3 @@ Code,Title,Description
complete,Complete,"The award was made and the standstill period, if any, has ended."
cancelled,Cancelled,"The award was cancelled by the buyer or the procuring entity (e.g. because of a change in needs, insufficient funds, or technical or procedural errors) after the bid submission deadline, but before the award was made or before the standstill period, if any, had ended."
unsuccessful,Unsuccessful,"The award failed (e.g. a review body cancelled the process during the standstill period) after the bid submission deadline, but before the award was made or before the standstill period, if any, had ended."
withdrawn,Withdrawn,No further information on the award is available under this ocid.
1 change: 0 additions & 1 deletion schema/codelists/contractFinalStatus.csv
Original file line number Diff line number Diff line change
Expand Up @@ -3,4 +3,3 @@ terminatedSuccessfully,Terminated successfully,"The contract was concluded and i
terminatedEarly,Terminated early,"The contract was concluded and in force, and is terminated early due to some non-completion."
cancelled,Cancelled,"The contracting process was cancelled by the buyer or the procuring entity (e.g. because of a change in needs, insufficient funds, or technical or procedural errors) after the award was made and the standstill period, if any, had ended."
unsuccessful,Unsuccessful,"The contract failed (e.g. the winning bidder(s) refused to sign the contract) after the award was made and the standstill period, if any, had ended, but before the contract was concluded and in force."
withdrawn,Withdrawn,No further information on the contract is available under this ocid.
1 change: 0 additions & 1 deletion schema/codelists/tenderFinalStatus.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,3 @@
Code,Title,Description
cancelled,Cancelled,"The contracting process was cancelled by the buyer or the procuring entity (for example, because of a change in needs, insufficient funds, or technical or procedural errors) after the contracting documents (for example, procurement documents) were available to potential supppliers, but not later than the bid submission deadline."
unsuccessful,Unsuccessful,"The contracting process failed (for example, no bids were received, all bids were withdrawn by the bidders, all bids were rejected by the buyer or the procuring entity) after the contracting documents (for example, procurement documents) were available to potential suppliers, but not later than the bid submission deadline."
withdrawn,Withdrawn,No further information on this process is available under this ocid.

0 comments on commit 1438e30

Please sign in to comment.