-
Notifications
You must be signed in to change notification settings - Fork 132
Pull requests: openshift/cluster-etcd-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
WIP: Bump library-go for static pod controller fixes.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#1390
opened Jan 24, 2025 by
benluddy
Loading…
WIP: endpoints: include learner node endpoints
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#1389
opened Jan 23, 2025 by
dgrisonnet
Loading…
WIP: Proof: bump(library-go)
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#1388
opened Jan 20, 2025 by
dgrisonnet
Loading…
[WIP] Proof PR: bump(library-go)
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1385
opened Jan 13, 2025 by
tkashem
Loading…
ETCD-695: Add job parallelism to recurrent backups
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
#1381
opened Dec 28, 2024 by
Elbehery
Loading…
[WIP][EXPERIMENT] OCPBUGS-45924: check for installer pods running on two nodes
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#1379
opened Dec 20, 2024 by
tkashem
Loading…
OCPBUGS-45731: Updating cluster-etcd-operator-container image to be consistent with ART for 4.19
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
bugzilla/valid-bug
Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#1376
opened Dec 5, 2024 by
openshift-bot
Loading…
NO-JIRA: migrate from bindata to go:embed
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1370
opened Nov 19, 2024 by
sanchezl
Loading…
OCPBUGS-42810: actively move bootstrap member lead
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#1369
opened Nov 19, 2024 by
tjungblu
Loading…
ETCD-681: Add etcd-backup-server container within separate daemonset
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
#1354
opened Oct 9, 2024 by
Elbehery
Loading…
2 tasks done
update library go for testing
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1353
opened Oct 9, 2024 by
tjungblu
Loading…
Issue shorter certs when ShortCertRotation feature gate is set
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ETCD-593: Enable experimental-stop-grpc-service-on-defrag
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
#1279
opened Jun 17, 2024 by
Elbehery
Loading…
NO-JIRA: move etcdcli to master node listing
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1229
opened Mar 15, 2024 by
tjungblu
Loading…
ProTip!
Exclude everything labeled
bug
with -label:bug.