Skip to content

Pull requests: openshift/cluster-etcd-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

WIP: Bump library-go for static pod controller fixes. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1390 opened Jan 24, 2025 by benluddy Loading…
WIP: endpoints: include learner node endpoints do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1389 opened Jan 23, 2025 by dgrisonnet Loading…
WIP: Proof: bump(library-go) do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1388 opened Jan 20, 2025 by dgrisonnet Loading…
[WIP] Proof PR: bump(library-go) do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1385 opened Jan 13, 2025 by tkashem Loading…
ETCD-695: Add job parallelism to recurrent backups approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. tide/merge-method-squash Denotes a PR that should be squashed by tide when it merges.
#1381 opened Dec 28, 2024 by Elbehery Loading…
[WIP][EXPERIMENT] OCPBUGS-45924: check for installer pods running on two nodes do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1379 opened Dec 20, 2024 by tkashem Loading…
OCPBUGS-45731: Updating cluster-etcd-operator-container image to be consistent with ART for 4.19 backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1376 opened Dec 5, 2024 by openshift-bot Loading…
NO-JIRA: migrate from bindata to go:embed jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1370 opened Nov 19, 2024 by sanchezl Loading…
OCPBUGS-42810: actively move bootstrap member lead approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1369 opened Nov 19, 2024 by tjungblu Loading…
ETCD-681: Add etcd-backup-server container within separate daemonset approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. tide/merge-method-squash Denotes a PR that should be squashed by tide when it merges.
#1354 opened Oct 9, 2024 by Elbehery Loading…
2 tasks done
update library go for testing approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1353 opened Oct 9, 2024 by tjungblu Loading…
Issue shorter certs when ShortCertRotation feature gate is set do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1315 opened Aug 12, 2024 by vrutkovs Draft
ETCD-593: Enable experimental-stop-grpc-service-on-defrag approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale.
#1279 opened Jun 17, 2024 by Elbehery Loading…
NO-JIRA: move etcdcli to master node listing approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1229 opened Mar 15, 2024 by tjungblu Loading…
ProTip! Exclude everything labeled bug with -label:bug.