Skip to content

ci: reusable workflow #12

ci: reusable workflow

ci: reusable workflow #12

Triggered via push January 17, 2025 02:08
Status Cancelled
Total duration 1m 1s
Artifacts

test-js.yml

on: push
JS v0.2.2  /  Bun
48s
JS v0.2.2 / Bun
JS v0.2.2  /  Deno
50s
JS v0.2.2 / Deno
JS v0.2.2  /  Lint
12s
JS v0.2.2 / Lint
JS v0.2.2  /  Measure coverage on Node
48s
JS v0.2.2 / Measure coverage on Node
Matrix: JS v0.2.2 / node
Fit to window
Zoom out
Zoom in

Annotations

13 errors
JS v0.2.2 / Lint
Process completed with exit code 1.
JS v0.2.2 / Node v20.18.1
The run was canceled by @paulmillr.
JS v0.2.2 / Node v20.18.1
The operation was canceled.
JS v0.2.2 / Deno
The run was canceled by @paulmillr.
JS v0.2.2 / Deno
The operation was canceled.
JS v0.2.2 / Node v22.13.0
The run was canceled by @paulmillr.
JS v0.2.2 / Node v22.13.0
The operation was canceled.
JS v0.2.2 / Measure coverage on Node
The run was canceled by @paulmillr.
JS v0.2.2 / Measure coverage on Node
The operation was canceled.
JS v0.2.2 / Bun
The run was canceled by @paulmillr.
JS v0.2.2 / Bun
The operation was canceled.
JS v0.2.2 / Node v18.20.5
The run was canceled by @paulmillr.
JS v0.2.2 / Node v18.20.5
The operation was canceled.