Skip to content

Commit

Permalink
Merge branch 'main' into gh-pages
Browse files Browse the repository at this point in the history
  • Loading branch information
ac6y committed Jan 10, 2025
2 parents 0df2cd3 + 1aaa862 commit 1ec314b
Show file tree
Hide file tree
Showing 3 changed files with 6 additions and 3 deletions.
2 changes: 1 addition & 1 deletion .github/workflows/static.yml
Original file line number Diff line number Diff line change
Expand Up @@ -4,7 +4,7 @@ name: Deploy static content to Pages
on:
# Runs on pushes targeting the default branch
push:
branches: ["gh-pages"]
branches: ["main", "prod", "gh-pages"]

# Allows you to run this workflow manually from the Actions tab
workflow_dispatch:
Expand Down
2 changes: 1 addition & 1 deletion README.md
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,7 @@ and the Rubin observatory. The S3DF infrastructure is optimized for
data analytics and is characterized by large, massive throughput, high
concurrency storage systems.

**December 26th 8:00am PST: ALL S3DF services are currently DOWN/unavailable. We are investigating and will provide an update later today.**
**January 6th 8:40am PST: All S3DF services are back UP. Users with k8s workloads should check for any lingering issues (stale file handles) and report to [email protected]. Thank you for your patience.**

## Quick Reference

Expand Down
5 changes: 4 additions & 1 deletion changelog.md
Original file line number Diff line number Diff line change
Expand Up @@ -43,13 +43,16 @@ If critical issues are not responded to within 2 hours of reporting the issue pl

### Current

**January 6th 8:40am PST: All S3DF services are back UP. Users with k8s workloads should check for any lingering issues (stale file handles) and report to [email protected]. Thank you for your patience.**

### Upcoming

### Past

|When |Duration | What |
| --- | --- | --- |
|Dec 10 2024|Ongoing (unplanned)|StaaS GPFS disk array outage (partial /gpfs/slac/staas/fs1 unavailability)|
|Dec 26 2024| 1 days (unplanned)|One of our core networking switches in the data center failed and had to be replaced. The fall-out from this impacted other systems and services on S3DF. Staff worked through the night on stabilization of the network devices and connections as well as recovery of the storage subsystem.|
|Dec 10 2024|(unplanned)|StaaS GPFS disk array outage (partial /gpfs/slac/staas/fs1 unavailability)|
| Dec 3 2024 | 1 hr (planned) | Mandatory upgrade of the slurm controller, the database, and the client components on all batch nodes, kubernetes nodes, and interactive nodes.
|Nov 18 2024|8 days (unplanned)|StaaS GPFS disk array outage (partial /gpfs/slac/staas/fs1 unavailability)|
|Oct 21 2024 |10 hrs (planned)| Upgrade to all S3DF Weka clusters. We do NOT anticipate service interruptions.
Expand Down