Skip to content

Merge branch 'zowe-release/v1.2.3-223' into zowe-release/v2.0.0 #203

Merge branch 'zowe-release/v1.2.3-223' into zowe-release/v2.0.0

Merge branch 'zowe-release/v1.2.3-223' into zowe-release/v2.0.0 #203

Triggered via push October 2, 2024 16:56
Status Cancelled
Total duration 11m 25s
Artifacts 5

build.yml

on: push
Matrix: build
Matrix: test_and_sonar
Matrix: verify
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test_and_sonar (IC-233)
Canceling since a higher priority waiting request for 'Build + Test&Sonar + Verify-refs/heads/release/v2.0.0' exists
test_and_sonar (IC-233)
The operation was canceled.
verify (IC-231)
Canceling since a higher priority waiting request for 'Build + Test&Sonar + Verify-refs/heads/release/v2.0.0' exists
verify (IC-231)
The operation was canceled.
test_and_sonar (IC-243)
Canceling since a higher priority waiting request for 'Build + Test&Sonar + Verify-refs/heads/release/v2.0.0' exists
test_and_sonar (IC-243)
The operation was canceled.
test_and_sonar (IC-231)
Canceling since a higher priority waiting request for 'Build + Test&Sonar + Verify-refs/heads/release/v2.0.0' exists
test_and_sonar (IC-231)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
plugin-verifier-report-IC-233 Expired
16.2 KB
plugin-verifier-report-IC-243 Expired
6.5 KB
zowe-explorer-2.0.0-2023.1.7 Expired
25.4 MB
zowe-explorer-2.0.0-2023.3 Expired
25.4 MB
zowe-explorer-2.0.0-243-EAP-SNAPSHOT Expired
25.4 MB